Line of Balance Scheduling Method. The Line of Balance proposes that the planning of activities should be according to a rate of production, or cycle, meaning the number of production units delivered by a working crew, by a unit of time (Henrich & Koskela, 2006).

How do you create a line of balance?

A line of balance diagram comprises a series of inclined lines which represent the rate of working between repetitive operations in a construction sequence. The Line‐of‐Balance also known as the Repetitive Scheduling Method (RSM), Location Based Scheduling, Vertical Production Method or Vertical Scheduling Method.

What is lob formula?

Line of Balance (LOB) is a management control process for collecting, measuring, and presenting facts relating to time (see Schedule Control), cost, and accomplishment – all measured against a specific plan.

What do you mean by LOB technique?

Line of balance (LOB) is a management control process used in construction where the project contains blocks of repetitive work activities, such as roads, pipelines, tunnels, railways and high-rise buildings.

What is line of balance formula?

The first unit starts at time 0, knowing the rate of production of the first activity one can draw the first line, the slope of the line is equal to the rate of production of the activity. By adding the duration of a unit activity at the end of the line, the finish time of the first activity is calculated.

What is line balancing PPT?

LINE BALANCING: DEFINITION Line Balancing is the process of assigning tasks to workstations in such a way that the workstations have approximately equal time requirements.

What is Q scheduling?

Q Scheduling is quantitative scheduling, in the context that quantities to be executed at different locations of the construction project form the elements of the schedule. Also, Q Scheduling is Queue Scheduling in the context that trades pass through the different segments of the project in a queue sequence.

What is the advantages of line of balance?

Benefits of Line Balancing Machine downtime is another type of waste time that occurs when equipment is not operating. Any idle time that occurs when operations are not in sync can be reduced by line balancing. Line balancing reduces inventory waste by ensuring that there is minimum work in progress.

What is line balancing PDF?

Assembly Line Balancing is the problem of assigning operations to workstations along an assembly line; in such a way that the assignment be optimal in some case. The minimization of the number of workstations and maximization of the production efficiency are the most common goals in the line balancing.

What is the purpose of line balancing?

The main objective of line balancing is to distribute the task evenly over the work station so that idle time to man of machine can be minimized [2] and to minimize total of idle time on the whole work station on a certain level of output [3] In general, the main purpose of line balancing is how to minimize the number …

What is line of balance techniques?

The line of balance scheduling technique is a linear scheduling method that allows the balancing of the operations such that each activity is continuously and efficiently performed in each consecutive unit.

What is line balancing method?

Line balancing is a production strategy that involves balancing operator and machine time to match the production rate to the takt time. Takt time is the rate at which parts or products must be produced in order to meet customer demand.

What are the types of line balancing?

There are two types of line balancing that include Static Balance and Dynamic Balance.

What is line balancing and example?

Line balancing reduces variations within a production line. A balanced production line is stable and flexible enough to adapt to changes. For example, if customer demand changes–meaning takt time changes–operations can be realigned quickly through line balancing.

Line of Balance (LOB) scheduling or Linear scheduling (LSM) is a method that shows the repetitive work that may exist in a project as a single line on a graph.

Is there a line-of-balance schedule planning system?

This paper describes a line-of-balance based schedule planning and control system, and its connection with lean construction methods, using a commercial software package called DYNAProject™. DYNAProject™ has been developed in collaboration with the Finnish construction industry.

What is a line of balance diagram?

A line of balance diagram comprises a series of inclined lines which represent the rate of working between repetitive operations in a construction sequence. The Line‐of‐Balance also known as the Repetitive Scheduling Method (RSM), Location Based Scheduling, Vertical Production Method or Vertical Scheduling Method.

What are the elements of the line of balance technique?

Elements of the line of balance technique include the following. Delivery schedule Assembly/lead time chart The run-out method of scheduling is a way of scheduling: Standard products as opposed to those that are custom made to order.